Four days after the tree work, on May 26th, Terry and the tractor returned. It was almost exactly a month since the rains of April-May began and the ground had dried out enough to finish the work of clearing the remaining wands.
Chug, chug, chug....Look how much I can carry! |
Volunteers got a bonfire going.....
....and Terry piled on more wood.
By mid morning this stage of the work was finished. Terry departed to return later with a smaller tractor, a plough and a cultivator.
With these he lifted the deep ruts caused by the tractor in the rain a month ago
the damage has been repaired
Now the mower will be able to get through without falling into the ruts.
|